Rio Tinto Ships First Mesa A/Warramboo Ore
The first full-length,163-car train followed the rail extension that connects to the Deepdale railway running from Pannawonica to the Cape Lambert port. It was driven by Cape Lambert train driver Shane Edwards, a local Aboriginal man, as requested by Kuruma and Marthudunera traditional owners, several of whom watched the train load and depart.
Total high-grade reserves across the Mesa A/Warramboo deposits are estimated at 249 million mt, with a total mine life of 11 years. The mine will sustain production of the sought-after Robe Valley pisolite ore at 32 million mt/y as production from the Mesa J deposit decreases.